REGION:ap-south-3·
DataDack CloudDataDackcloud
DATADACK VS HETZNER

The Sovereign Hetzner Alternative in India

Hetzner's price, but in an Indian region your users and the DPDP Act can both reach.

Should you switch from Hetzner?

Stay on Hetzner if your users are in Europe - nothing beats its price there. Move to DataDack if your users are in India: Hetzner has no Indian region, so every request leaves the country and personal data sits outside Indian jurisdiction under the DPDP Act.

Who should move, and who should stay

Switch to DataDack if

  • India-facing products currently served from Germany or Finland
  • Anyone who needs personal data of Indians to stay in India
  • Teams who want Hetzner's flat-rate habit with an Indian invoice
  • Workloads where round-trip latency is user-visible

Stay on Hetzner if

  • Your users are in Europe or North America - Hetzner is excellent there
  • You are optimising purely for the lowest possible euro price
  • Latency and jurisdiction genuinely do not matter to your workload
  • You run a hobby project where cost is the only criterion

Why teams move from Hetzner to DataDack

₹

Priced in rupees

Flat-rate monthly or pay-as-you-go hourly compute in INR with zero surprise bandwidth invoices.

ap-south-3 Noida

Sovereign Tier-IV infrastructure in Noida with sub-10ms latency across Northern India & DPDP compliance.

DDoS Protection

Always-on L3/L4 volumetric attack mitigation standard on every single virtual instance.

What you actually pay on DataDack

Reserved monthly rates in the Noida ap-south-3 region.

SpecificationDataDack
2 vCPU / 4 GB RAM / 30 GB SAS HDD₹1,152/mo
4 vCPU / 16 GB RAM / 30 GB SSD₹6,498/mo
8 vCPU / 16 GB RAM / 30 GB NVMe₹11,331/mo

Detailed Feature Matrix: DataDack vs Hetzner

Side-by-side technical and operational benchmark comparison

Feature / CapabilityDataDack CloudHetzner
Indian region
Noida (ap-south-3), Tier-IV
None - Germany, Finland, US, Singapore
Data residency under the DPDP Act
Stays in Indian jurisdiction
Cross-border by design
Billing
Flat INR with a GST invoice
EUR, no Indian GST invoice
DDoS protection
Free L3/L4 on every plan
Included, EU/US scrubbing
Support
24/7 engineers in Indian hours
Ticket-based, CET hours

Moving off Hetzner, step by step

  1. Step 1Inventory what runs on Hetzner today — instance sizes, disks, open ports and DNS records.
  2. Step 2Pick the matched DataDack plan and create the instance in the console, in the Noida ap-south-3 region.
  3. Step 3Move the data: restore from a snapshot or image, or sync the application and database over the VPC.
  4. Step 4Lower the DNS TTL, cut traffic over to the new IPv4 and verify, then destroy the source instance — billing stops the same hour.
Talk to an engineer about your migration

What carries over unchanged

A move off Hetzner is a re-host, not a rewrite. These come with you as they are:

  • Your Linux distro and kernel
  • Docker and docker-compose files
  • Nginx, Caddy or HAProxy configs
  • Your CI pipeline - only the deploy target changes
  • SSH keys and your existing automation
  • Postgres, MySQL, Redis and their dumps
  • Cron jobs and systemd units
  • Your domain and TLS certificates

DataDack vs Hetzner: common questions

How does DataDack's pricing compare with Hetzner?
DataDack bills a flat INR amount with a GST invoice rather than a USD card charge plus conversion fees, and charges no egress. Compare a matched instance on the pricing page for the current figure.
Where do my workloads run after moving off Hetzner?
In the sovereign Noida region (ap-south-3), inside Tier-IV facilities operated by Yotta NM1 and CtrlS. Data stays in Indian jurisdiction, which is what makes DataDack DPDP-compliant by default rather than by configuration.
Is DDoS protection an extra like it is elsewhere?
No. Always-on Layer 3 / Layer 4 mitigation is standard on every VPS and VM, including the Starter tier, and is never a paid add-on.
Are there egress or bandwidth charges?
No surprise egress invoices. Generous transfer is included with every plan and internal VPC traffic is unmetered.
How long does a migration from Hetzner take?
Most single-instance moves are done in an afternoon: create the matched plan, restore your image or sync the app, then cut DNS over. Our engineers will do the first instance with you — ask on /contact before you start.

Other comparisons

Get started

Deploy on sovereign Indian cloud in minutes.

Pick a region, pick an image, hit deploy. No sales call, no lock-in - just sovereign infrastructure at half the AWS price.

🇮🇳 Crafted in India · Trusted Globally · Noida region live